AP Land Services & Contracting

Site prep

Rough grade for a pad, a drive, or a homesite, including the ditch and culvert work that keeps water from sitting on it. Based in Gainesville, working the metroplex and North Texas.

  • Laser level on a yellow tripod in the foreground of a red-clay pad.
    Laser level on the graded pad.
  • Black culvert pipe laid in a trench beside a gravel road, with a survey tripod farther down the ditch.
    Culvert pipe set beside the road.
  • Opened lot of red dirt with grade stakes and a meter post, houses along the far tree line.
    Staked lot after the clearing.

Builders, barn crews, and fence contractors need the ground left a certain way. A pad that sheds water. A drive the concrete truck can actually use. Stakes they can find. That is the job: not a set of civil drawings, and not a promise of engineered plans. If the county wants a survey or a sealed grade plan, we say so before the work starts.

Clay in Collin and Denton Counties pumps when it is wet. A laser on a tripod is how we check the pad instead of guessing off the truck hood. Along a county road, a culvert has to sit at the right flow line or the ditch just makes a new pond. The photos here are a laser setup, a pipe beside a road, and a lot after it was opened and staked.

Access matters as much as acreage. A narrow gate, a finished subdivision street, or a soft creek crossing can decide whether the dozer walks in or the job waits for drier ground. Tell us how to get in.