AP Land Services & Contracting

Frisco lot clearing

Frisco filled in fast. The Star, the PGA campus, and the tollway corridor are built. The land work left is on the edges and on older homesteads squeezed between new streets.

  • John Deere dozer turning off a gravel road onto a cleared field, culvert visible in the ditch.
    Coming off the road onto the clearing.
  • Laser level on a yellow tripod in the foreground of a red-clay pad.
    Laser level on the graded pad.

A Frisco call is often a tight one. The lot still has the original hackberries or a cedar row the builder did not touch, and the neighbors already have finished lawns and a concrete street. The machine has to come in a gate, not across someone's yard. Haul-off matters more here than it does on open pasture, because there is nowhere to leave a brush pile.

Farther north, toward Prosper and Celina, the tracts get bigger and the ground is still former farm. Collin County clay holds water. A pad cut flat with no fall will pump the first time a truck drives it wet. We check grade instead of eyeing it off the curb.

We are not a Frisco paving or home-building company. We clear, take out what is in the way, and leave the ground so the next crew can start. Based in Gainesville, we schedule Frisco with other Collin County stops so the trip makes sense.